Support à la réalisation de projets
We support specific construction project teams with implementing AEC Best practices :
In Design phase:
-
- Ensuring design to budget through Target Value Design reducing risk to design over budget
- Agile Collaborative Design to ensure On Time In Full design delivery
In Engineering phase:
-
- One Piece Flow design through micro-zoning to optimize project delivery lead times (digital or analog)
- Lean Collaborative Preparation from Last Planner® System to ensure efficient execution reducing idle time on site (digital or analog)
- Set up Just-In-Time prefab & material delivery to reduce excessive inventory and optimize crane and team's time
- Set up Lean Logistics through 5S to set up a safe and efficient workplace
- Set up Integrated Quality Control processes using digital tools to ensure right first time execution reducing double work and rework
In Construction phase:
-
- Weekly Collaborative planning sessions from Last Planner® System (digital or analog) to synchronize all teams on site to work according to defined flow
- Sustain 5S on site (material containers, stock management, material, machines and people optimized flow) to maintain a safe and efficient workplace
- Following up on Integrated Quality Controls through digital tools to ensure right first time execution reducing double work and rework
- Daily stands and Visual Performance Management based on relevant on-site KPIs to keep continuous insights and team alignement on daily operations and performance
- Continuous Lean wastes reduction (continuous improvement practices) to eliminate deviations and ensure continuous control on daily operations at high performance level